For a more than a half a century of existence GRANIT has built many hydro technical structures of all kinds in Macedonia
These include concrete dams, embankments for river control, irrigation system and water supply system.
The company is proud of continuous contribution into the building and development of the national electric power system.
In all these projects, GRANIT was awarded as the main contractor
Concrete dam Sveta Petka not far from the capital enables production of additional 120 MWh that is enough to satisfy the capital household needs and some part of the capitals industry.
Knezevo earth-rock dam with its 1.7mil m3 of embankments will contribute additional 22.5mil m3 useful water accumulation to the hydro system Zletovica.
Gallery
GRANIT PRODUCTION
Our strategy is to be economically independent and self-sufficient for most of its basic resources. Therefore securing resources such as rock, concrete and asphalt is of outmost importance.
9
CONCRETE PLANTS
7
ASPHALT PLANTS
7
STONE QUARRIES
11
PRODUCTION FACILITIES
COMPANY AT A GLANCE
Founded in 1952 and privatized in 1996 as a Joint Stock company. Today, Granit has established itself as a leader in the building and construction industry.
WORLD HEADQUARTERS
Granit world headquarters are in Skopje, Republic of North Macedonia. Working Hours: Mon to Fri 08:30 to 16:30
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Strictly Necessary Cookies
Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.
If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.