Kicevo-Podvis-00

CONSTRUCTION OF HIGHWAY KICEVO – OHRID, SECTION KICEVO-PODVIS

Name of Contract Employer’s Contract Value of Work Estimated Completion Date
Construction Of Motorway Kicevo – Ohrid, Section Kicevo-Podvis Public Enterprise for State Roads of Republic of Macedonia 117.609.360,15 EUR 2018

CONSTRUCTION OF HIGHWAY KICEVO – OHRID, SECTION KICEVO-PODVIS

The Working Unit Kicevo – Ohrid is established by the decision of the Management Board of Granit in May 2014, in order to construct the Motorway Kicevo – Ohrid, section Kicevo – Podvis.

According to the Contract for construction of the Motorway:
– Granit Construction Stock Co. is nominated subcontractor;
– Sinohydro Corporation Limited is Main Contractor
– Consorcium GIM, Euroconsulting and Geing Krebs und Kiefer is Engineer;
– Public Enterprise for state roads is Employer.

The total price of the Contract for construction of the Motorway Kicevo – Ohrid, section Kicevo – Podvis is 117.609.360,15 euro.
Reinforced concrete works of the Motorway participate with more than 60% in the total price of the Contract for construction of the Motorway.

The time period for completion is 38 months from the commencement date.

Section Kicevo – Podvis consists of the following structures:
12 viaducts with prestressed beam girders, with total length of 3,60 km in both directions;
2 viaducts with balanced cantilevered method of construction, with total length of 1,80 km
2 overpasses
1 underpass with an interchange on the Motorway
Retaining walls with total length of 1,35 km

The critical points on the critical path of the Motorway Kicevo – Ohrid, section Kicevo – Podvis are the viaducts with balanced cantilevered method of construction, located at km 6+860 and km 9+105

 

CONTRACT ID

Contract name:
Construction Of Motorway Kicevo – Ohrid, Section Kicevo-Podvis

Brief Description of the Works performed:
Road construction works

Name of Employer:
Public Enterprise for State Roads of Republic of Macedonia

Name of Main contractor:
Sinohydro Corporation Limited Beijing- Branch Office Skopje

Gallery

GD Granit owns the copyright of the published photos. The usage of the photos is prohibited without written permission from the Company.

ГД Гранит АД Скопје го има авторското право над објавените фотографии. Истите не е дозволено да преземаат без писмена дозвола од Друштвото.

Project Video

video_granit_one

GRANIT PRODUCTION

Our strategy is to be economically independent and self-sufficient for most of its basic resources. Therefore securing resources such as rock, concrete and asphalt is of outmost importance.

  • 9
    CONCRETE PLANTS
  • 7
    ASPHALT PLANTS
  • 7
    STONE QUARRIES
  • 11
    PRODUCTION FACILITIES